Re: We have two plant has material price transfer, should it under one control area?

$
0
0

Hi, Ajay,

I checked Help file before.

Cross-Company Costing - Product Cost Planning (CO-PC-PCP) - SAP Library

Cross-Company Costing

Use

 

A material can consist of components that come from a different plant to that of the finished product. This plant may even be assigned to a different company code.

 

In such cases, you have the option to carry out cross-company costing across company codes within a controlling area. However, cross-controlling area costing is not supported.

 

Prerequisites

 

You activate costing across company codes in Customizing for Product Cost Planning.

 

Features

 

Costing across company codes enables you to do the following:

 

  • Access cost component splits for costs of goods manufactured in different company codes in a controlling area and transfer them.
  • Include manually entered cost components (such as those for transportation costs) with planned stock transfers
  • Release the costing results either for all company codes in the controlling area, or only for the company code in which you carry out the costing run

 

The legal valuation level is updated.

 

Is it means i  can not put them in two control area if Cross company code and plant existed.