Dear Syed,
Thank you very much. I will check in the morning, I can not now. In mean time, just tell me, because the materials that I talked about, are non stock materials, without to be maintained in the material material master, could this be an issue? And second - how are set your materials in MRP4 for dependent requirements - Individual and collective, individual or collective?
Thank you very much again,
Sorin